Static equipment service

Design Verification

Independent design verification for static equipment calculations, drawings, datasheets, and design basis documents. The service is suitable for owner engineering checks, EPC peer review, vendor package audits, and high-risk deliverable validation.

Design Verification main equipment photo
Design Verification supporting photo 2
Design Verification supporting photo 3

Detailed Scope

  • Code compliance checks against selected design standards and client specifications.
  • Calculation audit for assumptions, load cases, materials, corrosion allowance, and acceptance criteria.
  • Drawing cross-check against datasheets, calculations, project notes, and fabrication requirements.
  • Issue register preparation with severity, recommendation, owner, and closeout status.
  • Final verification statement with open items, risks, and required corrections.

Overview

  • Independent design verification for static equipment calculations, drawings, datasheets, and design basis documents. The service is suitable for owner engineering checks, EPC peer review, vendor package audits, and high-risk deliverable validation.

Typical Input Documents

  • Design calculations
  • Drawings
  • Datasheets
  • Design basis
  • Applicable specifications

Typical Deliverables

  • Design verification report
  • Issue register
  • Redline comments
  • Compliance matrix
  • Closeout recommendation

Software Used

  • PV Elite
  • AutoCAD
  • CAESAR II
  • ANSYS
  • HTRI

Typical Timeline

  1. 1Initial review: 1 working day
  2. 2Engineering or checking cycle: 2-5 working days
  3. 3Final closeout after comments: 1-2 working days

Who Should Request This Service

  • EPC contractors needing specialist support during proposal, detailed engineering, or closeout.
  • Fabricators needing checked calculations, drawings, MTOs, or vendor response support.
  • Operators and industrial clients needing independent technical review before approval or fabrication.

Workflow

  1. 1Document control review
  2. 2Technical verification
  3. 3Issue ranking
  4. 4Response review
  5. 5Final closeout

Common Applications

  • Peer review
  • Owner engineering
  • Vendor package audit
  • Before fabrication release
  • Design assurance